Repositorio Universidad del Cauca

Auxiliar de ingeniero residente de obra en la construcción “Reserva de la Colina 1” en el municipio de Popayán (Cauca)

Mostrar el registro sencillo del ítem

dc.contributor.author Velasco Cedeño, Kevin Esteban
dc.date.accessioned 2024-02-07T20:32:57Z
dc.date.available 2024-02-07T20:32:57Z
dc.date.issued 2022
dc.identifier.uri http://repositorio.unicauca.edu.co:8080/xmlui/handle/123456789/9111
dc.description.abstract La práctica profesional como auxiliar de ingeniería se desarrolló en la empresa Constructora Simbra S.A.S. en el proyecto Reserva de la Colina 1, bajo la dirección del ingeniero residente de obra José Ignacio Jacome. Como resultado del seguimiento, revisión del cumplimiento de las especificaciones técnicas y criterio de aceptación, se presenta este documento para optar el título de Ingeniero Civil de la universidad del cauca. En el transcurso de la pasantía se hizo un acompañamiento y revisión de los planos, así mismo como el cálculo de las cantidades de obra del presupuesto, se brindó supervisión y apoyo técnico a las actividades de: Construcción de cimentación, muros en mampostería, estructura, construcción de losa de entrepiso y vigas corona y vigas cinta. Además del control de desperdicios, control de calidad de materiales, control de consumos de materiales y pedidos de materiales. Cabe resaltar que se sustenta la información presentada, no sin antes verificar el cumplimiento de las normas legales vigentes y guías que garantizan la calidad en el sector constructivo. spa
dc.description.abstract The professional practice as an engineering assistant was developed in the company Constructora Simbra S.A.S., in the project of Reserva de la Colina 1, under the direction of the resident construction engineer José Ignacio Jacome. As a result of the monitoring, review of compliance with the technical specifications and acceptance criteria, this document is presented to opt for the title of civil engineer from the University of Cauca. During the internship, the plans were monitored and reviewed, as well as the calculation of the amounts of work in the budget, supervision and technical support were provided to the activities of: Construction of foundations, masonry walls, structure, construction mezzanine slab and crown beams and tape beams. In addition to waste control, quality control of materials, control of material consumption and material orders. for the record the information presented is supported, not without first verifying compliance with current legal regulations and guides that guarantee quality in the construction sector. eng
dc.language.iso spa
dc.publisher Universidad del Cauca spa
dc.subject Supervisión spa
dc.subject Planos spa
dc.subject Diseños spa
dc.subject Registro de construcción spa
dc.subject Avance de obra spa
dc.subject Proceso constructivo spa
dc.title Auxiliar de ingeniero residente de obra en la construcción “Reserva de la Colina 1” en el municipio de Popayán (Cauca) spa
dc.type Trabajos de grado spa


Ficheros en el ítem

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Buscar en DSpace


Listar

Mi cuenta